Protecting Your Building from Hail Roof Damage

By Dawn Killough

May 13, 2022

Close-up of hail impacting dark shingles.

Up to 25% of the United States experiences large hail episodes—and when they do, hail can cause severe damage to roofs and the HVAC equipment stored there. Hailstorms account for 70% of the average annual property losses from severe convective storms in the US. Building owners can protect their buildings and equipment by designing their buildings and roofs to withstand the damage caused by large hailstones.

FM Global, an insurance company that specializes in loss prevention and testing, provides a standard for testing and approving assemblies that provide greater hail resistance. Building owners and designers often rely on FM Global's resources to specify desired roofing assemblies and construction methods. These resources include RoofNav assemblies from FM Approvals as well as loss prevention data sheets and Approvals Standards. Well-maintained roofs that meet FM's hail testing and approval requirements are better equipped to protect buildings from hail and water damage that occurs during storms.

Assessing Risks from Hail Roof Damage

Hail can cause physical damage to a building's roof and the equipment stored there, including dents, cracking, mineral loss on modified bitumen sheets, and compound delamination. Older roofs or those in poor condition may be more susceptible to damage from hail. Roof equipment, including cooling fins and condenser coils, can also be damaged from falling hail. Skylights are subject to hail punctures, which are the main cause of water damage to buildings and their contents.

In the US, the most severe hail generally occurs in the Midwest and central contiguous states. According to FM, very severe hail can be found in the region from North Dakota to Texas and Colorado to Missouri. Roofs, roof assemblies, and equipment in this region should be designed to meet FM's specific hail requirements to better withstand hail roof damage.

Defining Very Severe Hail

FM Approvals has recognized three classes of hail: moderate, severe, and very severe.

Moderate hail (MH) is less than 1.75 inches in diameter, which is about the size of a cherry. Severe hail (SH) is 1.75 inches to 2 inches in diameter, similar in size to a golf ball. Very severe hail (VSH) is 2 inches or greater in diameter, similar in size to a billiard ball (or larger).

FM's Very Severe Hail (VSH) certification was added in 2016 based on data from the National Oceanic and Atmospheric Administration's National Weather Service and National Center for Environmental Protection's Storm Prediction Center. This data showed a concentration of reports of hail larger than 2 inches in diameter in the very severe hail region.

Passing a Very Severe Hail Test

FM tests assemblies in accordance with FM 4470:

  • To test an assembly for moderate hail, a 2-inch-diameter steel ball weighing 1.19 pounds is dropped from 81 inches above the assembly. Two samples, unweathered and weathered, are tested 10 times each. This test provides an impact energy of 8 foot-pounds.
  • Testing for severe hail, the same 2-inch-diameter steel ball is dropped from a height of 141.5 inches above the assembly. This test provides an impact energy of 14 foot-pounds.
  • When testing whether a roof assembly can withstand very severe hail, a 2-inch-diameter preformed ice ball is launched at the assembly using compressed air. Three samples are used in this test: one unconditioned, one UV weathered, and the third UV weathered and heat aged for 42 days prior to testing. This test provides an impact energy of between 53 and 58 foot-pounds.

After the test is performed, the roof assembly is inspected for dents, cracking, and delamination. Assemblies that pass the test are certified as meeting the FM criteria. You can find an online database of VSH-rated roofing assemblies here; GAF has over 1600 single ply VSH-listed assemblies.

The FM standard recommends that building owners inspect their roofs on a regular basis and repair deficiencies; the standard also advises replacing roofs where deficiencies cover a large area or when the roof is nearing the end of its useful life. An owner should also inspect heat and smoke vents and skylights for cracking, yellowing or discoloration, cloudiness, or other indications of damage due to weathering and aging. Skylights showing damage should be replaced as needed, and hail guards on HVAC equipment require inspections to ensure they are in place and free of damage.

For more information about GAF and very severe hail, contact your local commercial roofing contractor or complete our very severe hail contact form.

About the Author

Dawn Killough is a freelance writer in the construction, finance, and accounting fields. She is the author of an ebook about green building and writes for construction tech and green building websites. She lives in Salem, Oregon with her husband and four cats.

Related Articles

Volunteers in GAF Community Matters shirts stand in front of a home build site.
In Your Community

2024 Habitat for Humanity Carter Work Project in Twin Cites GAF Hometown

Under sunny blue skies, GAF hometown workers from Minneapolis joined over 4,000 Habitat for Humanity volunteers to donate their time and energy to the 2024 Carter Work Project in East St. Paul, Minnesota.The landmark 40th anniversary of the Carter Work Project celebrated former President Carter's 100th birthday. It also heralded the completion of 30 new all-electric homes in The Heights—the largest affordable housing development yet for Twin Cities Habitat—and marked the first installation of GAF Timberline Solar™ Energy Shingles.Supporting the Carter Work Project's PurposeGAF and the Habitat Carter Work Project share a common mission—to protect what matters most and bring people together to build homes, communities, and hope. Safe, secure, affordable housing is one of the surest routes to building resilient communities.Former President Jimmy Carter and former First Lady Rosalynn Carter were early champions of affordable housing. In 1984, they partnered with Habitat for Humanity to lead an annual week-long housing build. The momentum grew, and now, four decades later, over 100,000 Habitat volunteers have helped construct over 4,400 affordable homes for families in need.Each year, GAF volunteers travel from around the country for the Carter Work Project. GAF Community Matters also donates roofing materials, training, and installation expertise. Since 2011, GAF and its national network of certified contractors have supported roofing installation on over 3,800 roofing systems in collaboration with Habitat for Humanity, impacting more than 15,500 individuals.Building Resilience in MinnesotaThis year was particularly special thanks to first time solar shingle installation at a Carter Work Project. Even more, the project's location was in a GAF hometown and local GAF employees were on-site to volunteer.Benefitting Homeowners by Going Solar"We're donating 40 roofing systems and 40 solar energy systems from GAF and GAF Energy," says Jake Pream, a territory manager for GAF Energy in Minnesota.In addition to energy production, the beauty of the GAF Timberline Solar™ Energy Shingle is its simplicity. The nailable shingles are "just like your typical Timberline HDZ® Shingles," says Fan Ulacia, Director of Product Deployment Applications for GAF Energy and one of the minds behind the solar shingle design. "They're simple enough to install with a nail gun, but they produce energy." For Ulacia, improving access to solar energy, giving back to the community, and helping homeowners gain energy independence make GAF Energy a great fit for the GAF Habitat partnership."The solar-powered roofing system will make these homes more resilient, generate energy, and be a long-term benefit to Habitat homeowners by helping to offset their energy costs," adds Jeff Terry, vice president of corporate social responsibility and sustainability at GAF, who has volunteered at the Carter Work Project for 26 years.Helping a GAF HometownThe Twin Cities Habitat build is also special because it means the Carter Work Project takes place in a GAF hometown. As Pream, a St. Paul native, puts it, "I have friends and family quite literally a few houses down."The Minneapolis GAF manufacturing facility opened in 1935, and "it's something we're really proud of," says Austin Owens, a local GAF technical manager. Over the years, "we've made improvements to equipment and operations and made changes to help the environment and sustainability. We try to help the community as much as possible."Like many GAF volunteers at the Carter Work Project site, Joey Och, a GAF plant process engineer, grew up in the area. "Affordable housing is something Minneapolis and St. Paul have been pushing for," says Och, "so it's nice to be out here and help. Affordable housing brings more people into the community."With GAF donating roofing and solar energy systems for this year's project, safe and affordable homeownership, with reduced energy bills, will be accessible to more people.This housing security helps strengthen the community. The area may experience severe weather and its share of hardship, but "there's a lot of resiliency in this community," says Owens.Carrying On the Carter Work Project in 2024 and BeyondFor many reasons, the Carter Work Project inspires repeat volunteers. "Community does matter," says annual participant and GAF CARE Learning and Development Instructor Michael Humenik. "It's just fun to volunteer. I look forward to coming out every year."Habitat homeowners who return each year to volunteer are the true testament to the transformational power of access to safe, affordable housing. LeAndra Estes brought her hard work and a big smile to the week-long Twin Cities build. Estes is an annual volunteer for the program that changed her life. "I need and I want to give back to Habitat for Humanity, to the affiliates and partners, and to the future homeowners to come," she notes.Estes puts into words the value of affordable housing and how the benefits ripple far beyond the home. "When you have a home, you don't just have that home and your family. Your community also becomes your family," she explains.Although former President Carter has retired his tool belt after decades of humanitarian service, he surely must have been proud to see his legacy continue to evolve, especially with the revolutionary new solar shingle that supports homeowners' financial independence.Ready to get involved? Explore the Habitat for Humanity GAF Contractor Program and change lives for the better, starting today.

By Authors Annie Crawford

December 19, 2024

GAF Employee on the job
In Your Community

How GAF's Co-Op Program Makes a Difference in Students' Lives

As part of its effort to build resilient communities, GAF provides students across the country with opportunities to gain work experience and hands-on training. The GAF co-op program offers participants autonomy and leadership in project management, engineering design, budgeting, project installation, and more.Over the years, the GAF co-op recruiting program has helped students advance academically, grow professionally, and earn competitively while working full time with North America's largest roofing and waterproofing manufacturer.How the GAF Co-Op Program WorksThe program gives students high-impact, hands-on experience in the manufacturing sector. They perform meaningful work alongside supportive GAF mentors and senior leadership while earning a competitive wage. Participants can also receive credits from their university, which they can apply to their coursework.Differences between a Co-op and an InternshipInternships and co-ops have a few notable differences. At GAF, the main difference is the length of time. Internships at GAF usually last 10 weeks, but the co-op program is six months. While internship programs often allow students to stay enrolled in school and complete coursework as they gain professional training, co-op participants must take a semester off to gain full-time work experience.Not all companies pay internship participants for their work. However, at GAF, both interns and co-op students are paid competitive hourly wages. GAF also offers financial relocation assistance for qualifying co-op program candidates.Finally, participants in the GAF programs are there to learn real skills that will help them advance their future careers. GAF interns and co-op students are given the same responsibilities, and chances to collaborate on major projects, as full-time employees.Recent GAF Co-Op Success StoriesMin U, a mechanical engineering student at the University of Maryland, says he "fell in love with manufacturing" thanks to his placement on an engineering project. The experience gave him a firsthand account of the role engineering plays in manufacturing safety, profit, and operations. This ultimately led him to shift his career goals from construction management to manufacturing engineering.When Dante Stellar, an industrial engineering student at Virginia Tech, met GAF representatives at a career fair, he says he didn't expect to become a self-proclaimed "nerd for shingles" and develop a passion for manufacturing. However, that's exactly what happened. And that newfound passion paid off when Dante won Student of the Year from Virginia Tech's Cooperative Education and Internship Program. Dante notes he's now eager to return to GAF and aspires to become a manufacturing leader in the world of shingles.Michael Hesseltine, an electrical engineering student at Texas A&M University, chanced upon a GAF co-op recruiting listing online. After a series of interviews, he landed a project engineering co-op in Ennis, Texas. Working with the Ennis team on major projects solidified his manufacturing engineer career goals.Co-Op Students Complete Meaningful WorkStudents in the GAF co-op program are involved in meaningful projects and get to see their work's impact on day-to-day operations.During his time in Ennis, Michael designed a baler that compacts fiberglass scrap, reducing site disposal trips and costs. He also oversaw renovations of the site's maintenance mechanical break room from start to finish. He notes that his favorite contribution was helping design the electrical system for a dewatering press.In Baltimore, Min's core project was ensuring site compliance with state regulations for discharging stormwater runoff. Min managed all the project contractors and budget with his manager's and mentor's support. Throughout his time there, Min was exposed to Lean methodologies, 5S, risk mitigation, insurance compliance, cost control, and procedure standardization. He gained an overall understanding of manufacturing equipment and business.At the Tampa plant, Dante worked on a rock pad storage expansion project and installed a starwheel machine guarding the manufacturing line, among other important projects. According to Dante, the defining moment of his co-op experience was his granule silo refurbishment project, which involved replacing eight silos, including floor plates and support beams.Dante explains the trust and opportunities his mentors provided were key to his success. "At GAF, I was given the chance to interact with contractors, and immerse myself in the plant, which accelerated my learning," he says.Co-Op Students Build Professional RelationshipsThrough "lunch and learn" sessions, leadership speaker series, meetings with senior leadership, and mentorship, co-op students build long-term professional relationships.Dante was given the chance to showcase the coordination and safety efforts involved in his granule silo project to the GAF executive leadership team in Parsippany, New Jersey.For Min, getting the right feedback to grow meant having the right relationships. He notes the mentorship from his manager Alex Smith and engineering manager Mike Kloda was key to his progression. As advice to future co-op participants, he explains that "everyone is here to help... but it's up to you to drive that forward."Meanwhile, the autonomy and leadership opportunities program leaders gave Michael allowed him to grow technically and professionally. "I was often the go-to person for projects, managing contractors and ensuring everything was on track," he says.Joining an Industry Filled with OpportunityThe GAF co-op program helped Min, Michael, and Dante start and solidify their careers in manufacturing engineering. Following their experience, each student was excited and motivated by the autonomy, responsibility, and growth opportunities they were given. In fact, Min has since accepted a full-time role as a project engineer at the GAF plant in Baltimore. His expected start date is July 7, 2025.GAF is committed to fostering diversity, equity, and inclusion throughout the organization. It believes a talented and diverse organization can drive innovation, growth, and transformation more effectively. To further bolster inclusivity, GAF offers academic and merit scholarships, partners with the Thurgood Marshall College Fund to recruit from the nation's most diverse talent at Historically Black Colleges and Universities and Predominantly Black Institutions, and reaches out to candidates at career fairs nationwide.Bright and motivated minds who want to explore manufacturing have plenty of opportunities. From shingles to solar to environmental impact, GAF offers many exciting career paths.Are you ready to do work that matters and be empowered to explore a leadership role? Discover the co-ops, internships, and job opportunities available at GAF.

By Authors Annie Crawford

October 11, 2024

Installation of ISO Board and TPO on a Roof
Building Science

Roof Insulation: A Positive Investment to Reduce Total Carbon

Have you ever thought about building products reducing the carbon dioxide emissions caused by your building? When considered over their useful life, materials like insulation decrease total carbon emissions thanks to their performance benefits. Read on for an explanation of how this can work in your designs.What is Total Carbon?Total carbon captures the idea that the carbon impacts of buildings should be considered holistically across the building's entire life span and sometimes beyond. (In this context, "carbon" is shorthand for carbon dioxide (CO2) emissions.) Put simply, total carbon is calculated by adding a building's embodied carbon to its operational carbon.Total Carbon = Embodied Carbon + Operational CarbonWhat is Embodied Carbon?Embodied carbon is comprised of CO2 emissions from everything other than the operations phase of the building. This includes raw material supply, manufacturing, construction/installation, maintenance and repair, deconstruction/demolition, waste processing/disposal of building materials, and transport between each stage and the next. These embodied carbon phases are indicated by the gray CO2 clouds over the different sections of the life cycle in the image below.We often focus on "cradle-to-gate" embodied carbon because this is the simplest to calculate. "Cradle-to-gate" is the sum of carbon emissions from the energy consumed directly or indirectly to produce the construction materials used in a building. The "cradle to gate" approach neglects the remainder of the embodied carbon captured in the broader "cradle to grave" assessment, a more comprehensive view of a building's embodied carbon footprint.What is Operational Carbon?Operational carbon, on the other hand, is generated by energy used during a building's occupancy stage, by heating, cooling, and lighting systems; equipment and appliances; and other critical functions. This is the red CO2 cloud in the life-cycle graphic. It is larger than the gray CO2 clouds because, in most buildings, operational carbon is the largest contributor to total carbon.What is Carbon Dioxide Equivalent (CO2e)?Often, you will see the term CO2e used. According to the US Environmental Protection Agency (EPA), "CO2e is simply the combination of the pollutants that contribute to climate change adjusted using their global warming potential." In other words, it is a way to translate the effect of pollutants (e.g. methane, nitrous oxide) into the equivalent volume of CO2 that would have the same effect on the atmosphere.Today and the FutureToday, carbon from building operations (72%) is a much larger challenge than that from construction materials' embodied carbon (28%) (Architecture 2030, 2019). Projections into 2050 anticipate the operations/embodied carbon split will be closer to 50/50, but this hinges on building designs and renovations between now and 2050 making progress on improving building operations.Why Insulation?Insulation, and specifically continuous insulation on low-slope roofs, is especially relevant to the carbon discussion because, according to the Embodied Carbon 101: Envelope presentation by the Boston Society for Architecture: Insulation occupies the unique position at the intersection of embodied and operational carbon emissions for a building. Insulation is the only building material that directly offsets operational emissions. It can be said to pay back its embodied carbon debt with avoided emissions during the building's lifetime.A Thought Experiment on Reducing Total CarbonTo make progress on reducing the total carbon impact of buildings, it is best to start with the largest piece of today's pie, operational carbon. Within the range of choices made during building design and construction, not all selections have the same effect on operational carbon.When making decisions about carbon and energy reduction strategies, think about the problem as an "investment" rather than a "discretionary expense." Discretionary expenses are easier to reduce or eliminate by simply consuming less. In the example below, imagine you are flying to visit your client's building. Consider this a "discretionary expense." The input on the far left is a given number of kilograms of carbon dioxide equivalent (CO2e) generated for the flight, from the manufacturing of the airplane, to the fuel it burns, to its maintenance. The output is the flight itself, which creates CO2 emissions, but no durable good. In this case, the only CO2 reduction strategy you can make is to make fewer or shorter flights, perhaps by consolidating visits, employing a local designer of record, or visiting the building virtually whenever possible. Now consider the wallpaper you might specify for your client's building. It involves a discretionary expenditure of CO2e, in this case, used to produce a durable good. However, this durable good is a product without use-phase benefits. In other words, it cannot help to save energy during the operational phase of the building. It has other aesthetic and durability benefits, but no operational benefits to offset the CO2 emissions generated to create it. Your choices here are expanded over the previous example of an airplane flight. You can limit CO2 by choosing a product with a long useful life. You can also apply the three Rs: reduce the quantity of new product used, reuse existing material when possible, and recycle product scraps at installation and the rest at the end of its lifespan. In the final step in our thought experiment, consider the insulation in your client's building. As before, we must generate a certain amount of CO2e to create a durable good. In this case, it's one with use-phase benefits. Insulation can reduce operational energy by reducing heat flow through the building enclosure, reducing the need to burn fuel or use electricity to heat and cool the building. The good news is that, in addition to the other strategies considered for the flight and the wallpaper, here you can also maximize operational carbon savings to offset the initial embodied carbon input. And, unlike the discretionary nature of some flights and the often optional decision to use furnishings like wallpaper, heating and cooling are necessary for the functioning of almost all occupied buildings.Based on this example, you can consider building products with operational benefits, like insulation, as an "investment." It is appropriate to look at improving the building enclosure and understanding what the return on the investment is from a carbon perspective. As the comparison above demonstrates, if you have a limited supply of carbon to "invest", putting it into more roof insulation is a very smart move compared to "spending" it on a discretionary flight or on a product without use-phase carbon benefits, such as wallpaper.This means we should be careful not to measure products like insulation that save CO2e in the building use-phase savings only by their embodied carbon use, but by their total carbon profile. So, how do we calculate this?Putting It to the TestWe were curious to know just how much operational carbon roof insulation could save relative to the initial investment of embodied carbon required to include it in a building. To understand this, we modeled the US Department of Energy's (DOE) Standalone Retail Prototype Building located in Climate Zone 4A to comply with ASHRAE 90.1-2019 energy requirements. We took the insulation product's embodied energy and carbon data from the Polyisocyanurate Insulation Manufacturers Association's (PIMA) industry-wide environmental product declaration (EPD).To significantly reduce operational carbon, the largest carbon challenge facing buildings today, the returns on the investment of our building design strategies need to be consistent over time. This is where passive design strategies like building enclosure improvements really shine. They have much longer service lives than, for example, finish materials, leading to sustained returns.Specifically, we looked here at how our example building's roof insulation impacted both embodied and operational carbon and energy use. To do this, we calculated the cumulative carbon savings over the 75-year life of our model building. In our example, we assumed R-30 insulation installed at the outset, increased every 20 years by R-10, when the roof membrane is periodically replaced.In our analysis, the embodied CO2e associated with installing R-30 (shown by the brown curve in years -1 to 1), the embodied carbon of the additional R-10 of insulation added every 20 years (too small to show up in the graph), and the embodied carbon represented by end-of-life disposal (also too small to show up) are all taken into account. About five months after the building becomes operational, the embodied carbon investment of the roof insulation is dwarfed by the operational savings it provides. The initial and supplemental roof insulation ultimately saves a net of 705 metric tons of carbon over the life of the building.If you want to see more examples like the one above, check out PIMA's study, conducted by the consulting firm ICF. The research group looked at several DOE building prototypes across a range of climate zones, calculating how much carbon, energy, and money can be saved when roof insulation is upgraded from an existing baseline to current code compliance. Their results can be found here. Justin Koscher of PIMA also highlighted these savings, conveniently sorted by climate zone and building type, here.Support for Carbon Investment DecisionsSo how can you make sure you address both operational and embodied carbon when making "carbon investment" decisions? We've prepared a handy chart to help.First, when looking at lower-embodied-carbon substitutions for higher-embodied-carbon building materials or systems (moving from the upper-left red quadrant to the lower-left yellow quadrant in the chart), ensure that the alternatives you are considering have equivalent performance attributes in terms of resilience and longevity. If an alternative material or system has lower initial embodied carbon, but doesn't perform as well or last as long as the specified product, then it may not be a good carbon investment. Another consideration here is whether or not the embodied carbon of the alternative is released as emissions (i.e. as part of its raw material supply or manufacturing, or "cradle to gate" stages), or if it remains in the product throughout its useful life. In other words, can the alternative item be considered a carbon sink? If so, using it may be a good strategy.Next, determine if the alternative product or system can provide operational carbon savings, even if it has high embodied energy (upper-right yellow quadrant). If the alternative has positive operational carbon impacts over a long period, don't sacrifice operational carbon savings for the sake of avoiding an initial embodied product carbon investment when justified for strategic reasons.Last, if a product has high operational carbon savings and relatively low embodied carbon (lower-right green quadrant), include more of this product in your designs. The polyiso roof insulation in our example above fits into this category. You can utilize these carbon savings to offset the carbon use in other areas of the design, like aesthetic finishes, where the decision to use the product may be discretionary but desired.When designing buildings, we need to consider the whole picture, looking at building products' embodied carbon as a potential investment yielding improved operational and performance outcomes. Our design choices and product selection can have a significant impact on total carbon targets for the buildings we envision, build, and operate.Click these links to learn more about GAF's and Siplast's insulation solutions. Please also visit our design professional and architect resources page for guide specifications, details, innovative green building materials, continuing education, and expert guidance.We presented the findings in this blog in a presentation called "Carbon and Energy Impacts of Roof Insulation: The Whole[-Life] Story" given at the BEST6 Conference on March 19, 2024 in Austin, Texas.References:Architecture 2030. (2019). New Buildings: Embodied Carbon. https://web.archive.org/web/20190801031738/https://architecture2030.org/new-buildings-embodied/ Carbon Leadership Forum. (2023, April 2). 1 - Embodied Carbon 101. https://carbonleadershipforum.org/embodied-carbon-101/

By Authors Elizabeth Grant

September 18, 2024

Don't miss another GAF RoofViews post!

Subscribe now